MANUFACTURE
Gypsum Stone Mine
Gypsum Blocks Workshop
Feather-and-Slot Blocks Workshop
Gypsum Wood Fiber Board Workshop
Gypsum Binders Workshop
 
NEWS
Monument Unveiled at Décor-1 PGW
'Omnipresent Life', a monument by the prominent sculptor G.Pototsky was unveiled at Décor-1 Peshelansky Gypsum Works on August 28. During the ceremony, V.S.Lavrov announced that 'Omnipresent Life' (also known as 'Combating Stereotypes') was a gift to the Company from the International Kindness Academy in recognition of an invaluable contribution to the development of Russia's cultural capital and economy.

A Great Event
Report on the celebration of the 76th anniversary of Décor-1 PGW LLC and the Miner’s Day. Busy preparations for the celebration began in the morning of August 28 with the installation of stands, tents, makeshift retail outlets, attractions, and stage platforms. Company employees and guests flocked to Shaktior stadium, the venue of the day’s main festivities.

Victory as the Best Present
On August 28, Peshelansky Gypsum Works celebrated the Miner’s Day. All day long, Shaktior stadium hosted various exhibitions, lotteries and draw games. Of course, the festivities could not do without a musical performance.

Personnel Training for Gypsum Fiber Board Shop
To prepare for the future production of gypsum fiber boards, an onsite training was organized for 27 of the Company employees at the Tambov-based Tamak Co., which manufactures cement fiber boards using a similar technology. As of today, 7 technicians have completed training. Another 10 are currently doing the course.

Статьи

Контакты

Main / Manufacturing Facilities

Производство Пешеланского Гипсового Завода декор 1Производство Пешеланского Гипсового Завода декор 1Производство Пешеланского Гипсового Завода декор 1

Manufacturing Facilities

Décor-1 Peshelansky Gypsum Works LLC has a raw materials base of its own — a mine sitting on the Bebyaevo gypsum stone deposit.
he current annual production capacity of the mine is 300 K tons of gypsum stone.

Reconstruction of the mine, scheduled to begin in 2008, is to increase its production capacity to 500 K tons/year after phase 1. Phase 2, planned for the future, is to increase the mine’s annual production capacity to 1 million tons.

7% of all gypsum stone mined by the Company is sold as raw material. The rest is processed in the Company’s gypsum binders shop with the rated annual production capacity of 185 K tons, including 20 K tons of gypsum binders for the porcelain, faience and ceramic ware industry and 165 K tons of gypsum binders for construction purposes. Of these, some 69 K tons are sold on the market and the remaining 96 K tons are used by the Company for the manufacture of gypsum-based products.

Gypsum product shop consists of 3 areas:

— № 1 area: production of feather-and-slot boards, with a rated capacity of 1,600,000 m2/year;
— № 2 area: production of feather-and-slot boards, with a rated capacity of 360 K m2/year;
— Production of gypsum wall blocks (size 390×190 × 188 mm) and feather-and-slot gypsum boards (500×250 × 200 mm).

Following completion of the mine’s reconstruction project phase 1, the Company is planning to increase the gypsum binders shop’s production capacity to 435,000 tons per year. To this end, the Company is contemplating installation of a calcinations system with an annual rated capacity of 250,000 K tons, to service the existing feather-and-slot board production shop and a gypsum wood fiber board production shop (with the rated capacity of 50 K m2/year) scheduled for commissioning in June of this year.

When the new gypsum binders shop is put into operation, the Company will proceed with the reconstruction of the feather-and-slot board production shop (to increase the annual production capacity to 3 million m2).